Integralia participates in the construction of the most important hospital in Europe
Integralia takes part in this exciting project creating the most important Hospital in Europe, whose size will be 247.000m2 and will have an investment over 200 million.
Integralia, contract awardee, will produce and erect more than 2.500 tons of steel in hot-rolled profiles, 30.000 m2 of metal deck, and more than 5.000 m2 of grating. Our proximity ensures our capability to act quickly and dynamically.
All production processes previous to transportation, will be carried out in our facilities in Cabañas de la Sagra, as engineering development, manufacturing and assembly of all elements, in order to ensure that everything complies with all tolerances and quality standards required.
This is not the first hospital project executed by Integralia, it joins the one undertaken in Haiti in 2014 and it is especially exciting to be part of it for the added value and meaning of creating a hospital of this magnitude in our province, because it will generate a total of 35 new jobs as welders (site and workshop), assemblers and technical staff, among others.

New Toledo’s Hospital
Site works are starting and the prediction is to begin receiving patients in the second half of 2019, after 24 months of edification works and 6 of technological endowment.
This hospital, which will be a reference in Spain and Europe, it will have 1142 beds, 62 boxes, 39 operating rooms, and includes the creation of an assisted reproduction area, a specific area for the coordination of transplants, stroke units, mammary pathology units, and a vascular laboratory.
“Integralia saves lives with each hospital project carried out”